Past critical violations — corrected

Yeshivat Lev Torah

3300 Kings Highway, Brooklyn, 11234

Yeshivat Lev Torah's public record shows 7 DOHMH inspections, with 3 critical violations cited in the last 3 years and 0 currently open, last inspected 2026-05-05. Per those records, the center had critical violations in the last 3 years, all recorded as corrected. The median licensed center in Brooklyn has 2 critical violations over the same window. Its license appears on DOHMH's current active-programs roster. Government records on this page are free; the interpretation layer (peer ranking, trend, cross-agency check) is the paid Safety Analysis.

Last inspection · record checked against the city's inspection portal .

Inspection history

DOHMH inspection records, newest first, with each violation's official severity and current OPEN/CORRECTED status. We show the government record verbatim and don't grade it.

How to read this record
  • Critical — DOHMH's classification for violations that pose a risk to children's health or safety. The center must correct these, and DOHMH follows up.
  • General — lower-risk Health Code violations. They still must be corrected.
  • OPEN — not yet recorded as corrected in the latest data. CORRECTED — fixed, and the correction is on the record.
  • DOHMH inspects licensed centers routinely, after complaints, and to verify corrections — so a violation on record is normal; what matters is severity, whether it is still open, and whether it repeats. Details in our methodology.
2026-05-05No Violations
2026-04-15 · Compliance Inspection of Open ViolationsViolation(s) cited — General

DOHMH inspection summary: Reinspection Required; Fines pending

Moderate · §131.09(f)CORRECTED

Walls and ceiling in commercial building Not properly constructed; Not maintained in good repair; unclean

What this means

Building and equipment Walls and ceilings in the commercial building were not properly constructed, were not in good repair, or were unclean.

Worth asking: What was fixed after the inspection?

More on this section

Moderate · §43.14(a)CORRECTED

Teaching and supervisory staff trained in abuse/maltreatment identification and reporting. 2 hours of training received every 24 months. Training provided by OCFS approved trainer. New staff trained within 3 months of hire

What this means

Records Teaching and supervisory staff must be trained to identify and report child abuse and maltreatment. The rule calls for 2 hours every 24 months and for new staff to be trained within 3 months of hire. The citation means that training was missing or out of date.

Worth asking: When was your staff last trained on recognizing and reporting abuse?

More on this section

2026-02-04 · Initial Annual InspectionViolation(s) cited — General

DOHMH inspection summary: Reinspection Not Required

Moderate · §131.09(e)CORRECTED

Floors in commercial building properly Not constructed; Not maintained in good repair; unclean

What this means

Building and equipment Floors in the commercial building were not properly constructed, were not in good repair, or were unclean.

Worth asking: What was repaired or cleaned after the inspection?

More on this section

Moderate · §43.14(a)CORRECTED

Teaching and supervisory staff trained in abuse/maltreatment identification and reporting. 2 hours of training received every 24 months. Training provided by OCFS approved trainer. New staff trained within 3 months of hire

What this means

Records Teaching and supervisory staff must be trained to identify and report child abuse and maltreatment. The rule calls for 2 hours every 24 months and for new staff to be trained within 3 months of hire. The citation means that training was missing or out of date.

Worth asking: When was your staff last trained on recognizing and reporting abuse?

More on this section

Moderate · §131.09(f)CORRECTED

Walls and ceiling in commercial building Not properly constructed; Not maintained in good repair; unclean

What this means

Building and equipment Walls and ceilings in the commercial building were not properly constructed, were not in good repair, or were unclean.

Worth asking: What was fixed after the inspection?

More on this section

Moderate · §131.09(f)CORRECTED

Walls and ceiling in commercial building Not properly constructed; Not maintained in good repair; unclean

What this means

Building and equipment Walls and ceilings in the commercial building were not properly constructed, were not in good repair, or were unclean.

Worth asking: What was fixed after the inspection?

More on this section

Showing the most recent inspections — the full history, the map, and the Safety Analysis load right on this page.

The closest other programs

Compare side by side →